Transform for Draft Tube of Unit 2 in the Third Power Station of Gutianxi Hydropower Plant
DOI:
Author:
Affiliation:
Funding:
Ethical statement:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
Abstract:
This paper introduces the improvement project for draft tube of Unit 2 in the third power station of Gutianxi Hydropower Plant, it includes: the partial reconstruction of draft tube, renewal of draft tube manhole door, the base of draft tube Grouting.
Reference
Related
Cited by
Get Citation
Tong DuiLong. Transform for Draft Tube of Unit 2 in the Third Power Station of Gutianxi Hydropower Plant[J]. Journal of Integration Technology,2013,2(1):66-69